PNG‑Pacific‑SinEXPO CENTRE Enquire
Aerial artist’s impression of the proposed masterplan

Masterplan

1.42 hectares at Section 221, Lot 12: allocated, circulated, planted and secured before construction begins.

Artist’s impression: proposed development
Site allocation

Where the 14,200 square metres go.

Site allocation summary
ComponentArea
Buildings6,000 sqm
Landscaping & public spaces4,200 sqm
Roads & circulation2,000 sqm
Parking areas2,000 sqm
Total site area14,200 sqm · 1.42 ha
Landscape zones

Six outdoor rooms.

4,200 sqm of the site is public landscape: not leftover ground, but six designed zones, each with its own function.

Landscape & public zones
ZoneContainsArea
Main Entrance PlazaWelcome signage & water feature; visitor drop‑off and seating; tropical flower gardens800 sqm
Pacific Nations Flag PlazaEighteen partner‑nation flags; ceremonial and diplomatic welcome space500 sqm
Cultural Pavilion GardenNative trees and palms: frangipani, hibiscus, heliconia; shaded seating and stone pathways1,000 sqm
Water Cascade & Reflection PoolThe 16‑metre cascade; reflection pool with night lighting; VIP gathering space700 sqm
Pacific Cultural WalkwayLandscaped pedestrian promenade; cultural sculptures and art; connects all major facilities600 sqm
Outdoor Performance GardenOpen‑air performance space for traditional and cultural events600 sqm · ~200 persons
Artist’s impression of the Main Entrance Plaza
Main Entrance Plaza
800 sqm
Artist’s impression of the Pacific Nations Flag Plaza
Pacific Nations Flag Plaza
500 sqm
Artist’s impression of the Cultural Pavilion Garden
Cultural Pavilion Garden
1,000 sqm
Artist’s impression of the Water Cascade and Reflection Pool
Water Cascade & Reflection Pool
700 sqm
Artist’s impression of the Pacific Cultural Walkway
Pacific Cultural Walkway
600 sqm
Artist’s impression of the Outdoor Performance Garden
Outdoor Performance Garden
600 sqm

Artist’s impressions: proposed development

Access & circulation

One entrance. One direction.

A single controlled entrance from John Guise Drive, then a security check point, a visitor drop‑off plaza, and one‑way circulation around the entire complex, so no vehicle ever meets another head‑on. A dedicated service road runs the same direction.

The site faces Melanesia Haus, the Office of the Prime Minister, which sets the security posture for the whole plan.

Parking allocation

Visitor parking
120 lots
VIP parking
20 lots
Staff parking
30 lots
Tourist bus parking
10 lots
Service vehicle parking
10 lots
Total
190 lots
Security & sustainability

Designed in, not added later.

Security

24‑hour security gatehouse · CCTV surveillance system · access control and visitor registration · perimeter fencing with night lighting · dedicated emergency access lane.

Sustainability

Roof solar energy system · rainwater harvesting · LED garden lighting · on‑site waste management and recycling · sub‑surface bio‑retention drainage.

Request the full project dossier.

Request the dossier
EnquireEmail