Sixteen metres of moving water, on a net-zero power system.

The cascade is the front of the building and the whole of its power story. It runs on its own solar canopy and battery vault, and it keeps a fixed daily schedule.

Cascade operating cycle

As drawn

Select a stage to see the cascade at that hour · design parameters, not live telemetry

Architectural visualisation of the proposed cascade lit at dusk, seen from above 17:30  ·  Night illumination shift Architectural visualisation · proposed

 

Battery vault·
Connected load·
Cascade flow·
Lighting·
Solar input·

Hydraulic & water logistics

Kinetic water volume180,000 L
Flow rate450 L/s
Gravity ribbon fall16 m
Hydraulic pumps3 × 110 kW
Spotlights24 V brass, 75°
AutomationDMX-512

Connected electrical load

Pumping core subsystem220 kW
Illumination subsystem15 kW
Control automation subsystem2 kW
Total operating load237 kW

Power comes off a 1.2 MW roof solar canopy through a smart inverter matrix into a 2.5 MWh LFP battery vault. A programmable logic controller drives variable-speed drives on the pumps and a DMX controller on the lighting.

Colour, on a schedule.

Spotlights sit inside the base filtration pool, angled upward at seventy-five degrees into the falling water. A DMX-512 digital automation board modulates the colour cycle: the national colours of Papua New Guinea in red, black and gold, and of Singapore in red and white, for state visits and international conventions.

Request the services brief

Rear aerial of the proposed complex at the training wing, architectural visualisation
Architectural visualisation · proposed · rear aerial

Speak to the project team.

The project team responds to enquiries from government bodies, partner nations, development-finance institutions and prospective commercial partners.


Section 221, Lot 12
John Guise Drive, Waigani
National Capital District
Port Moresby, Papua New Guinea

enquiry@pngpacificsin.org

enquiry@pngpacificsin.org Enquire